Sunday, March 22, 2009

Final Project Production Schedule

Week 1: 3/30 For the first progress check, I just found out I will be in NY getting more surgery :o( (I will bring back documentation), so I will make sure to have my media needed to create my animation posted to my blog to show what I have collected. I will have the basic footage of the project, the 2 minute pool clip CLIP, the still shots and CU shots and stills of my dog for the end of the film. I will also try and plan to have five of the backgrounds drawn and the other photoshop layers if needed for the background's animation.   

Week 2: 4/6 For this progress check I plan to have the last ten backgrounds and layers for the animations, such as the flying pizza in Italy, the floating clouds in San Fran. and the Llama in the Himalayas all made as separate layers for the film. Some will have Scottie flying through them. 

Week 3: 4/13 This progress check I plan to have the layers animated with the small Scottie's flying through each scene and my rotoscope frames rudimentary look and animated, with possible detail added in later.

Week 4: 4/20 For this progress check the timeline will be set, some of the animation may still need slight tweeking, but this Rough Cut will be missing just a sound track and possible changes from class suggestions. 

Final Project due - 4/27

No comments: